Name | PPGI / PPGL |
Full name | Galvanized ,Galvalume,Pre-paited galvanizing,Pre-paited galvalume |
Basic material | Cold Roll |
Color of the PPGI and PPGL | Any color in RAL |
Standard | AISI, ASTM, BS, DIN, GB, JIS |
Spangle | Normal / Min / Zero |
Brand Name | SDG |
Thickness | 0.12mm-1.5mm |
Width | 600mm to 1500mm |
Length | Max.6m |
Surface Treatment | Hop-dipped Galvanized |
AZ coating | 30-150g/m2 |
Spangle | Normal/Min/Zero |
Minimum order | 25 Metric Tons |
Place of Origin | Shandong, China(Mainland) |
Packing | Fully Applicable for exporting seaworthy packing of horizontal type on wooden skids |
Price terms | FOB Qingdao, CFR, CIF |
Terms of payment | T/T, L/C at sight |
Delivery Detail | within 7-25 days after receiving pre-payment (as per the order quantity) |
Coil ID | 508mm/610mm |
Coil Weight | 4-8 tons |
Supply Ability | 20000MT per month |
Application | Construction Structure, roofing, commercial use, household appliance, industry-use etc. |
Shandong SDG New Materials Corp (hereinafter referred to as SDG ), SDG is equipped with excellent equipment including two sets 1450 reversible rolling mills, three sets 1150 reversible rolling mills, two sets galvanizing & galvalume lines, two sets color coating lines, one set correcting machine, and one set pickling line.
Our products are very sold well in South-east Asia,Middle east,Africa,South-America and so on.They are very popular with their markets.
Infrastructure: Building & Construction: Roofing; Terrace; Window Frame; Door: Rolling-up Door; Shutter; Mobile House;Interior Decorations: Wall; Door Frame; Steel Structure; Screen; Ceiling; Elevator;
Household Appliances :Fridge; Washing Machine; Microwave Oven; Air-Conditioner; Duplicating Machine, etc;
Transportation :Auto Panel; Interior Decorative Panel; Carriage Panel;
1. Are you trader or factory?
We are factory in Shandong, China.
2. How can we arrive your factory?
Please take flight to Jinan Airport or Jinan Station, it will take one and half hour to get our factory.
Only one hour and fifty-eight minutes from Beijing/Peking to our Taian city by high speed railway.
3.How long is your delivery time?
For the first cooperation, common production time is 25 -30 days.
4. What's your payment terms?
We accept T/T, L/C at sight and Alibaba Trade Assurance.
If you have any other questions, please do not hesitate to contact us.
.
Contact Information:
담당자 : | Greg Cheng |
---|